UNH MUB Exterior Renovations, Durham, NH
Scope of Work consisted of demolition to remove asbestos paneling, sheathing, metal and wood framing. New composite insulated metal panels were installed over new wood framing and structural sheathing. All trim was wrapped in heavy aluminum and exposed beams/wood were painted. All work had to be scaffolded, some areas over 80+ feet.